DetraSet Lab Care Learn GB - Flipbook - Side 23
A S S E M B LY I N S T R U C T I O N S
①
① When the wall rail is secured to the wall, the lower part
is inserted horizontally into the desired hole and
rotated 90 degrees, after which it is securely locked in
place. The lower part is then rotated back 90 degrees
and can be removed or moved to another height.
②
② The upper part of the bracket is slid over the lower part
and secured with the set screw in the lower part. After
that, the brackets are ready for mounting shelves.
ASSEMBLY INSTRUCTIONS | 23