2024 Winter Contract V6 - Report - Page 6
Winterize Generator............................................................................................ □ Yes □ No
$150.00 per gen.
□ Specify:_______________
_
Price:$
_
_ _
Note: Winterizing Does Not Include Spring Tune-Up and Does Not Guarantee Start-Up.
Stem Drives(s) 1 or 2 (Check & Repair as Needed) ....................................................... □ Yes □ No
$150.00 perhr.
□ Change Oil in Drive(s) 1 or 2 □ Remove and Store Drive(s) 1 or 2
Note: Does Not Include Spring Installation
Price to Be Billed Upon Completion:$
_ _
_
Change Outboard Gear Lube ............................................................................... □ Yes □ No
$150.00 perhr.
Price to Be Billed Upon Completion: $
_ _ _
_
Oil & Filter Change ............................................................................................. □ Yes □ No
□ Generator $150.00 perhr.
□ Engine(s) 1 or 2
Price to Be Billed Upon Completion:$
_
_ _
Transmission Fluid & Filter Change Engine(s) 1 or 2.................................................... □ Yes □ No
$150.00 perhr.
□ Specify:_ _ _ _ _ _ _ _ _ _ _ _ _ _
_
Price to Be Billed Upon Completion:$
_
_ _
Fuel Filter Change............................................................................................... □ Yes □ No
□ Generator $150.00 perhr.
□ Engine(s) 1 or 2
Price to Be Billed Upon Completion:$
_
_ _
Flush and Fill Cooling System................................................................................ □ Yes □ No
□ Generator $150.00 perhr.
□ Engine(s) 1 or 2
Price to Be Billed Upon Completion:$
_
_ _
Replace Engine Zincs ........................................................................................... □ Yes □ No
□ Generator $150.00 perhr.
□ Engine(s) 1 or 2
Price to Be Billed Upon Completion:$
_ _
_
Change Water Pump Impeller................................................................................. □ Yes □ No
□ Generator $150.00 perhr.
□ Engine(s) 1 or 2
Price to Be Billed Upon Completion:$
_ _
_
Batteries - Disconnect/Storage (Includes Trickle Charging, Re-Installation Not Included) ...... □ Yes □ No
$100.00 ea.
□ Number of Batteries:_ _ _ _ _ _ _ _ _ _
_
Price:$
_
_ _
Decommission Water Systems .................................................................................. □ Yes □ No
□ Ice Maker(s)/Refrigeration:_ _
_
□ Fresh Water System:_ _
_
□ Raw Water System:_ _
$150.00 perhr.
Price to Be Billed Upon Completion:$
_
_ _
Decommission Sanitation System(s) 1 or 2................................................................... □ Yes □ No
NOTE: System Must Be Pumped Out or There is a $50.00 Charge for Pump Out Service
$175.00 perhr.
□ Specify:_ _ _ _ _ _ _ _ _ _ _ _ _ _
_
Price to Be Billed Upon Completion:$
_
_ _
Decommission Air Conditioning System(s) .................................................................... □ Yes □ No
$175.00 perhr.
□ Specify:_ _ _ _ _ _ _ _ _ _ _ _ _ _
_
Price to Be Billed Upon Completion:$
_ _
_
SHRINK WRAPPING: (Note: Prices Do Not Include Removal in Spring)
Power Boats (includes venting) ............................................................................... □ Yes
□ Express 25' and Under: $22.00 per ft.
$24.00 per ft.
□ Express 26'-35':
$28.00 per ft.
□ Express 36'-45':
$33.00 per ft.
□ Express 46'-55'
➔ Quoted
□ Express 56' +
□ Bridge 26'-35':
□ Bridge 36' to 45':
□ Bridge 46'-55'
□ Bridge 56' +
□ No
$26.50 per ft.
$30.00 per ft.
$35.00 per ft.
➔ Quoted
Price:$
- -
-