Drainfast Brochure Issue 36 - Flipbook - Page 255
During the project carry
out routine checks of
the MuckStopper and
empty any debris that
it has collected,
keeping the drains free
of blockages.
Four
The MuckStopper
should be extracted
using machine lift. At
the end of the project,
the MuckStopper
should be removed.
The grating and frame
can then be re-installed
when setting final
levels before surfacing
as usual.
action@drainfast.co.uk
255
www.drainfast.co.uk
9 MUCKSTOPPER
Three