Stage 0 > Strategic Definition: Supplementary Material: 0/SM5
Table 0/1 (continued)
ELECTRONIC
Only available at www.ribabookshops.com/agreements
PRINTED equivalent
Domestic Project Agreement 2010 (2012 revision) – Consultant
Two selections online
No printed equivalent
• Domestic Conditions of Appointment for a Consultant
2010 (2012 revision)
• Core component bundle:
– Small Project Services Schedule 2010
(2012 revision)
– Domestic Project Agreement 2010: Notes:
Part 1 Use and Completion; Part 2 Model Letter
(2012 revision)
– Fees and Expenses Schedule 2010 (2012 revision)
Sub-consultant Agreement 2010 (2012 revision)
Two selections online
• Conditions of Appointment for a Sub-consultant 2010
(2012 revision)
• Core component bundle
– Sub-consultant Agreement 2010: Notes:
Part 1 Use and Completion; Part 2 Model Letter
(2012 revision)
– Fees and Expenses Schedule 2010 (2012 revision)
Other Components (in editable format)
Selected one by one online, as needed
Access Consultancy Services Schedule 2010
(2012 revision)
Contractor’s Design Services bundle:
• Contractor’s Design Services Schedule 2010
(2012 revision)
• Contractor’s Design Services Schedule:
Notes Parts 1-4 (2012 revision)
Historic Building or Conservation Project Services
Schedule 2010 (2012 revision)
Initial Occupation and Post-occupation Evaluation
Services Schedule (2012 revision)
Master Planning Services Schedule 2010 (2012 revision)
Multi-disciplinary Design Services Schedule 2010
(2012 revision)
Small Historic Building or Conservation Project Services
Schedule 2010 (2012 revision)
One pack comprising four separate printed documents
• Conditions of Appointment for a Sub-consultant 2010
(2012 revision)
• Sub-consultant Agreement 2010: Notes:
Part 1 Use and Completion; Part 2 Model Letter
(2012 revision)
• Fees and Expenses Schedule 2010 (2012 revision)
• Changes since 2010 Edition
No printed equivalents of Other Components –
although note that sample versions are reproduced in
RIBA Agreements 2010 (2012 revision) Electronic-only
Components
Supplementary Agreements (in editable format)
Selected one by one online, as needed
DRAFT Third Party Rights Schedule (2012 revision)
DRAFT Warranty by a Sub-consultant (2012 revision)
DRAFT Public Authority Supplement (2012 revision)
Guides (in non-editable format)
No printed equivalents of Supplementary Agreements
– although note that sample versions are reproduced
in RIBA Agreements 2010 (2012 revision) Electronic-only
Components
Selected one by one online, as needed
A Guide to Access Consultancy Services
A Guide to Consumer Rights and Building Contracts
A Guide to Working with an Architect: Repair and
Alteration of Historic Buildings
A Guide to Working with an Architect: Repair and
Alteration of Places of Worship
No printed equivalents of Guides