Job Book 9th Edition - Book - Page 70
ONLINE VERSION
58
Stage 0 > Strategic Definition: Supplementary Material: 0/SM5
There is a series of other components that supplement or replace core
components provided with each agreement:
•• Access Consultancy Services Schedule (2012 revision)
•• Contractor’s Design Services Schedule (2012 revision)
•• Contractor’s Design Services Schedule: Notes: Parts 1–4 (2012 revision)
•• Initial Occupation and Post-occupation Evaluation Services Schedule (2012
revision)
•• Multi-disciplinary Design Services Schedule (2012 revision)
•• Master Planning Services Schedule (2012 revision)
•• Historic Building or Conservation Project Services Schedule (2012 revision)
• Small Historic Building or Conservation Project Services Schedule (2012 revision).
There is a series of Supplementary Agreements:
•• Draft Third Party Rights Schedule (2012 revision)
•• Draft Warranty by a Sub-consultant (2012 revision)
• Public Authority Supplement (2012 revision).
A series of electronic guides is also available:
•• A Guide to Access Consultancy Services
•• A Guide to Initial Occupation and Post-occupation Evaluation Services
•• A Guide to Working with an Architect: Repair and Alteration of Historic Buildings
• A Guide to Working with and Architect: Repair and Alteration of Places of Worship.