Contractor Engagement: Supplementary Material: P/SM2
• electrical services (e.g. floor layouts showing lighting, power, alarms)
• specifications (e.g. particular for trades prescription and performance,
general specification for workmanship, materials, finishes)
• programme (e.g. bar chart)
• method statements (e.g. general organisational matters and, in particular, the
health and safety information proposals).
The tender figure will usually be required to be made separately. With it will be
the contract sum analysis.
The structure of the contract sum analysis will be in accordance with the
Employer’s Requirements. A typical breakdown could be as follows:
• design work
• preliminaries
• health and safety provisions
• demolition
• excavation
• concrete
• brickwork and blockwork
• roofing and cladding
• woodwork
• structural steelwork
• metalwork
• mechanical and plumbing services
• electrical services
• glazing
• painting and decorating
• drainage and external works.