Stage 2 > Concept Design: Supplementary Material: 2/SM1
The structure of the contract sum analysis will be in accordance with the
Employer’s Requirements. A typical breakdown could be:
• Design work
• Preliminaries
• Health and safety provisions
• Demolition
• Excavation
• Concrete
• Brickwork and blockwork
• Roofing and cladding
• Woodwork
• Structural steelwork
• Metalwork
• Mechanical and plumbing services
• Electrical services
• Glazing
• Painting and decorating
• Drainage and external works.