Guide to Using the RIBA Plan of Work 2013 - Other - Page 37
30
Stage 5
Construction
Task Bar
Tasks
Core Objectives
Offsite manufacturing and onsite Construction in accordance with
Construction Programme and resolution of Design Queries from site
as they arise.
Procurement
Administration of Building Contract, including regular site inspections and
review of progress.
Programme
The RIBA Plan of Work 2013 enables this stage to overlap with a number of
other stages depending on the selected procurement route.
(Town) Planning
There are no specific activities in the RIBA Plan of Work 2013, however
the contractor will need to comply with any construction-specific planning
conditions, such as monitoring of noise levels.
Suggested Key
Support Tasks
Review and update Sustainability Strategy and implement Handover
Strategy, including agreement of information required for commissioning,
training, handover, asset management, future monitoring and maintenance
and ongoing compilation of ‘As-constructed’ Information.
Update Construction and Health and Safety Strategies.
Support tasks are now focused on health and safety on site and ensuring that
the project handover and post-occupancy activities, determined earlier, are
properly facilitated.
Sustainability
Checkpoints
• Has the design stage sustainability assessment been certified?
• Have sustainability procedures been developed with the contractor and
included in the Construction Strategy?
• Has the detailed commissioning and Handover Strategy programme been
reviewed?
• Confirm that the contractor’s interim testing and monitoring of construction
has been reviewed and observed, particularly in relation to airtightness and
continuity of insulation.
• Is the non-technical user guide complete and the aftercare service set up?
• Has the ‘As-constructed’ Information been issued for post-construction
sustainability certification?
Information
Exchanges
(at stage completion)
‘As-constructed’ Information.
UK Government
Information
Exchanges
Not required.
Variable task bar
Variable task bar
Variable task bar
www.ribaplanofwork.com