Lys samlet m for bagside - Flipbook - Side 9
DAMPA
®
MARINE CEILING SYSTEMS
DAMPA®
Integrated DCC 300 Luminaire
Main features
Installation principles
• Fulfil B-0 classification without additional insulation.
1. Secure the provided mounting brackets to the end
of the luminaire.
• Low building/installation height
• Fast and easy installation
• Reduced total installation costs
Cost Saving Integration
Prepositioned DAMPA luminaires can be included in
the pre-cut ceiling supply, hereby saving both time,
materials and total installation cost.
DAMPA can also offer assistance with layout
proposals and full material take-off.
2. Install the luminaire so the ceiling carriers support
the mounting brackets.
3. When in position secure the mounting brackets to
the carrier with the 5 mm screws and nuts provided.
4. Complete the electrical connections.
5. Without any additional insulation B-0 classification is
achieved. For possible B-15 classification, only the top
rear side of the luminaire requires to have be insulated
with 50 mm of fire batts, density 110 kg/m3.
6. Install light source
7. Install surrounding ceiling panels.
8. Install frame and secure position with 2 self-tapping
screws.
Packaging
Identification & handling on site
DAMPA luminaires are supplied completely with
frames and installation attachments in non-returnable
cardboard boxes, easy to stack for optimum handling
and storage.
For easy and efficient handling on site, all boxes are
provided with labels that inform about the content.
The boxes are delivered on non-returnable pallets
suitable for forklifting.
DAMPA, DK-5690 Tommerup, Tel.: +45 63 76 13 00, dampa@dampa.dk, www.dampa.com
Dampa Marine - 05/2022 - 30648
All packing materials are environmentally friendly
and recyclable, suitable for both truck delivery and
containerized shipment. The materials have to be
stored under cover in a dry and ventilated area.