Lys samlet m for bagside - Flipbook - Side 21
DAMPA®
Integrated DCC 300 Luminaire
Main features
Glare Evaluation According to UGR
• Fulfil B-0 classification without additional insulation.
ρ Ceiling
ρ Walls
ρ Floor
• Low building/installation height
Room Size
X
Y
50
50
30
70
70
50
50
30
50
30
30
50
30
50
30
30
20
20
20
20
20
20
20
20
20
Viewing direction at right angles
to lamp axis
Viewing direction parallel
to lamp axis
2H
3H
4H
6H
8H
12H
13.8
14.9
15.4
15.9
16.1
16.3
14.9
15.9
16.4
16.8
17.0
17.1
14.1
15.2
15.8
16.3
16.5
16.7
15.1
16.1
16.6
17.1
17.3
17.4
15.3
16.4
16.9
17.4
17.6
17.7
13.8
14.8
15.3
15.9
16.1
16.3
14.8
15.8
16.3
16.8
17.0
17.1
14.0
15.1
15.7
16.3
16.5
16.7
15.1
16.0
16.6
17.1
17.3
17.4
15.3
16.3
16.8
17.4
17.6
17.8
4H
2H
3H
4H
6H
8H
12H
14.3
15.6
16.3
17.0
17.2
17.5
15.2
16.4
17.0
17.6
17.8
18.0
14.6
16.0
16.7
17.4
17.7
17.9
15.5
16.7
17.4
18.0
18.2
18.4
15.8
17.0
17.7
18.4
18.6
18.8
14.2
15.6
16.3
17.0
17.3
17.5
15.2
16.4
17.0
17.6
17.8
18.0
14.6
15.9
16.7
17.4
17.7
18.0
15.5
16.7
17.3
17.9
18.2
18.4
15.7
17.0
17.7
18.3
18.6
18.9
8H
4H
6H
8H
12H
16.7
17.5
17.9
18.2
17.2
18.0
18.3
18.5
17.1
18.0
18.4
18.7
17.6
18.4
18.7
19.0
18.0
18.8
19.2
19.5
16.6
17.5
17.9
18.3
17.2
17.9
18.3
18.6
17.1
17.9
18.4
18.8
17.6
18.4
18.8
19.1
18.0
18.8
19.2
19.6
12H
4H
6H
8H
16.7
17.6
18.1
17.2
18.0
18.4
17.2
18.1
18.5
17.6
18.5
18.9
18.0
18.9
19.4
16.7
17.6
18.1
17.2
18.0
18.4
17.1
18.1
18.6
17.6
18.4
18.9
18.0
18.9
19.4
• Reduced total installation costs
DAMPA can also offer assistance with layout
proposals and full material take-off.
70
30
20
4H
• Fast and easy installation
Cost Saving Integration
Prepositioned DAMPA luminaires can be included in
the pre-cut ceiling supply, hereby saving both time,
materials and total installation cost.
70
50
Variation of the observer position for the luminaire distances S
Installation principles
1. Secure the provided mounting brackets to the end
of the luminaire.
S = 1.0H
S = 1.5H
S = 2.0H
+0.2 / -0.3
+0.4 / -0.6
+0.9 / -0.9
+0.3 / -0.3
+0.4 / -0.7
+0.8 / -0.9
Standard table
BK06
BK06
Correction
Summand
-1.5
-1.6
Corrected Glare Indices referring to 2700lm Total luminous Flux
2. Install the luminaire so the ceiling carriers support
the mounting brackets.
3. When in position secure the mounting brackets to
the carrier with the 5 mm screws and nuts provided.
4. Complete the electrical connections.
5. Without any additional insulation B-0 classification is
achieved. For possible B-15 classification, only the top
rear side of the luminaire requires to have be insulated
with 50 mm of fire batts, density 110 kg/m3.
6. Install light source
7. Install surrounding ceiling panels.
8. Install frame and secure position with 2 self-tapping
screws.
Packaging
DAMPA luminaires are supplied completely with
frames and installation attachments in non-returnable
cardboard boxes, easy to stack for optimum handling
and storage.
All packing materials are environmentally friendly
and recyclable, suitable for both truck delivery and
containerized shipment. The materials have to be
stored under cover in a dry and ventilated area.
The boxes are delivered on non-returnable pallets
suitable for forklifting.
Identification & handling on site
DAMPA, DK-5690 Tommerup, Tel.: +45 63 76 13 00, dampa@dampa.dk, www.dampa.com
Dampa Marine - 05/2022 - 30654
For easy and efficient handling on site, all boxes are
provided with labels that inform about the content.