UPDATED A5 Panasonic technical handbook F 2025 - Flipbook - Page 71
PACi Elite R32 Triple Splits Ð Pipework
Pipe parameters
Triple split Ð UÐ
200PZH2E8 (3 X 71
indoor units)
L
CZ-P3HPC2BM
Total pipe length
L + L1 + L2 + L3
Maximum branch length
L1 or L2 or L3
20m
Maximum branch length
difference
L 1-L2, L2- L3, L1L3
10m
Height diff, outdoor above
H1 above
< 30m
Height diff, outdoor below
H1 below
< 15m
Height diff, indoor to indoor
H2 or H3 orH4
< 0.5m
L3
H1
L1
L2
H4
H2
H3
Pipe
sizes
L
1Ó1/8Ó & 3/8Ó
L1
L2
5/8Ó & 3/8Ó
Additional charge Ð 45g/m
71
L3
Use the main pipe to gain any rise or fall required for the pipes.
" The number of bends should be 8 or less in a single system,
and 15 or less overall.
" Branch pipes should be positioned horizontally.
< 90m