NRS-3829-2-[5-17768B] Tamworth School File 1912-1922 - Flipbook - Page 24
a.,PARTMENT OF PUBLIC ifC1-, KS.
Tamworth New School - Re Furniture.
T have seen the Contractor re this matter and he
informs me that it is no doubt time that the furniture was
ordcred, but that it is hopeless to expect that the building
will be ready for occupation at the end of the Christmas
The Contract time expires on the 10.3.19, •
Vacation.
• enerEetically right
althouah the Contractor has •
from the start and has porsonally.suprintended the work nea)ly
the whole time, he does not expect to be quite finished by
Contract time and some time back said he would most likely
have to ask for an exteusion. Considerable delay has bee
experienced in the delilTery of materials, especially roofing
tiles. Under the circumstances, therefore, it would appear
inevitable that the two halls referred to will be required for
a further term.
Joseland
SupervisinE itrcnitect.
T amworth 16.1 .19.
Inspectina EnEineer,
Tamworth.
Submitted.
H.M. Clarke
for Inspectina EnEineer
(intd)
mar.,,worth. 16.1.19.
Architect,
Department of Lkiucation.
Submitted for inforation.
irchitect,
Department of Education.
0.1.19.
The Under Secretary.
ir.HerzoL,
For nec(!ssary action in conqection with lease of
intd) M.C.
20.1.19.