5.2 TEMPORARY WORKS IMPLEMENTATION PLAN
5.2.5
An example construction phase plan (CPP) and arrangements for the ‘construction
works’ is shown in figure 1 below. These will influence ‘temporary works’.
figure 1 – CITB form template - example of a construction phase plan (extract)
5.2.6
The PC’s TWC or SC’s TWC should update the temporary works register to identity
who has specific responsibilities such as design, design checking, maintenance,
inspection and issuing permits etc.
Version 2 © mytemporaryworks 2023 | The control of temporary works – procedural guide