4.3 THE DESIGN BRIEF
4.3.5
The design brief should be prepared before design work is started.
4.3.6
There is no specific format for the design brief however BS5975 does provide a list of
information that should be considered when preparing the brief for any type of
structure. Refer to the clause for the full list.