Minority-Commerce-Weekly-Newsletter - Flipbook - Page 10
10
WDF invites all interested and Certi昀椀ed MBE/WBE/DBE & SDVOB 昀椀rms to submit proposals for the following Projects:
GENERAL CONSTRUCTION BIDS: Details and Contract documents can be obtained by Dina Cardoso (P) 914-776-8185 (E) dcardoso@wd昀椀nc.net .
Bid dates are subject to change.
Awarded Projects
NYPA ES-GSN-0839; NYCDEP WI285A- Goals: MBE 15%; WBE 10%.
PANYNJ Newark Airport Terminal 1- Goals: M/WBE 20%
Trades included but not limited to: 1. Material Supplies – Pipe, Valves, Fittings, Fin-tube, Air outlets; 2. Equipment – Air Curtains, A/C Units Split,
A/C Units, AHU’s / RTUs, Dampers, Fans, Fuel Oil Pump/Specialties, Fuel Oil-Initial Fill, Heat Exchanger, Heat Tracing, Heaters, Pumps , Starters/
VFD’s, Thermometers & Gauges, Sound traps; 3. Subcontracting – HVAC piping, Rigging, Sheet metal (and/or supplier), Electrician to Install Automatic Temperature Controls, Insulation, Water treatment , Air and water Balancing, Duct Cleaning
DCAS Citywide Plumbing and Fire Suppression #85621B0011 – Goals: M/WBE 25%
Trades included but not limited sitework, concrete, masonry work, metals, woods & plastic, thermal & moisture protection, doors & windows, 昀椀nishes,
specialties, equipment, special construction, conveying system, HVAC, plumbing, electrical and instrumentation.
NYCHH 23-JOC-HV1 #26-2310000 – Goals: M/WBE 30%
Trades included but not limited to site conditions, concrete, masonry, metals, wood & plastic, thermal & moisture protection, openings, 昀椀nishes, specialties,
equipment, furnishings, special construction, conveying equipment, integrated automation, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities.
NYC Dept of Corrections JOC Plumbing Work #07223B0001 – Goals: M/WBE 25%
Trades included but not limited to site conditions, concrete, masonry, metals, wood & plastic, thermal & moisture protection, openings, 昀椀nishes, specialties,
equipment, furnishings, special construction, conveying equipment, integrated automation, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities.
DDC Design Build NYC Borough-Based Jails Program (Brooklyn) – Goals: M/WBE 30%
This project is subject to a Non-Disclosure Con昀椀dentiality Agreement. Please contact estimating@wd昀椀nc.net for further information or to request Bid
Documents Trades included but not limited to site conditions, concrete, masonry, metals, wood & plastic, thermal & moisture protection, openings, 昀椀nishes, specialties, riggings, testing & balancing, water treatment, insulation, exterior improvements, plumbing, HVAC, electrical, communications. electronic
safety and security, earthwork and utilities.
Awarded NYCDEP Job Order Contracts
Goals: Combined MBE/WBE 30%
Trades included but not limited to: Plumbing- Site work, Asphalt paving, Water main, Sewer work, Electrical and Insulation:
Resiliency Program JOC General Construction RLCY-S-J06G and RLCY-S-J12G, Location – Various: Trades included but not limited to plumbing- site work,
asphalt paving, water main, sewer work, electrical and insulation.
JOC-18-SP: Plumbing Work at South Region (Newtown Creek, North River, Oakwood Beach, Port Richmond, Red Hook facilities)
JOC 16NP, Location- Various: Mechanical/Plumbing Projects throughout the North Region of DEP Facilities
JOC-17-EG: General Construction Work at various Bureau of Wastewater Treatment facilities within East Region (26th ward, Coney Island, Jamaica, Owls Head and
Rockaway)
JOC-17-EP: Plumbing Work at various BWT facilities within East Region, Queens and Brooklyn, NY (26th Ward, Coney Island, Jamaica, Owls Head and Rockaway)
JOC-17-NG: General Construction for North Region, Queens, Bronx and Manhattan, NY
JOC-20-EP: Plumbing Work at various BWT facilities within East Region, Queens and Brooklyn, NY (26th Ward, Coney Island, Jamaica, Owls Head and Rockaway)
JOC-22-SP: Plumbing Work at various BWT facilities within South Region (Newtown Creek, North River, Oakwood Beach, Port Richmond, Red Hook facilities)
Awarded DASNY Contracts
Goals: MBE 18%; WBE 12%
DASNY JOC REGION CR403 BRONX/K/NASSAU/M/SI Trades included but not limited to: Insulation, Controls, Electric, Chemical treatment, Con昀椀ned Space.
DASNY JOC REGION CR539 BRONX/K/NASSAU/M/SI Trades included but not limited to: Insulation, Controls, Electric, Chemical treatment, Con昀椀ned Space.
Section 3 Employment Opportunities
WDF supports hiring Section 3 of the Housing and Urban Development (HUD) mandate that requires employment and other economic opportunities generated by federal assistance to public housing authorities to be directed, whenever possible, to public housing residents and other low and very
low-income residents to work on all of our New York City Housing Authority (“NYCHA”) projects. WDF supports hiring Resident Employment Program
(REP), which requires that 15 percent of the labor amount of NYCHA construction contracts greater than $500,000 be spent on resident hiring. To that
end, WDF’s approach to meet NYCHA Section 3 requirement and our past Section 3 performance has been to commit to working with Resident Economic
Empowerment Sustainability Department (REESE) to source Category 1 and 2 residents.
Awarded NYCHA Contracts
Goals: REP 15%; Section 3 30%; MWBE 30%;
M/WBE Business Concerns Trades included but not limited to: Site work, Concrete, Masonry, Misc. Metals, Wood and Plastics, Thermal and Moisture
Protection, Doors and Windows, Finishes, Specialties, Furnishings, Electrical, Landscaping and Pest Control, Carpentry, Painting, Acoustical Ceiling,
Sprinkler, Fire Protection, Structural Steel, Insulation, Electrical, Pumps, Storefront Glass, Roo昀椀ng.
Restoration Associated with the Sandy Recovery Program at Baruch Houses and Lavanburg Homes: Location- Lower East Side Manhattan
Sandy Recovery Program at Jacob Riis I Houses: Location – Lower East Side Manhattan
Sotomayor Houses Boiler Replacement: Location – Bronx
Job Order Contract GR1610155: Location – Various Developments Bronx/Queens