General
1. Which Projects can participate? All projects that meet DC Construction code are eligible to
participate in the APR Program.
2. How do I qualify? Applicants must submit a complete and accurate building permit
application online, as well as upload all associated design documents that meet the
programs criteria (refer to page 5: Get a Building Permit & Plan Submission Checklist).
A preliminary screening process will verify the scope of the project to establish the basis for
scheduling and review costs. A 100 % permit set is required for this consultation and will also
highlight any review requirements outside of DCRA that may be necessary before
acceptance into Accelerated review.
The screening process will determine if the project needs the following approvals:
a. Approvals from federal or District government agencies
b. Zoning clearances administered through the Office of Zoning
c. Green/Energy clearances
These clearances must be presented at the time of application. Applicant may request a ‘PreAcceptance Checklist’ by emailing dcraacceleratedreview@dc.gov.
3.
When is a permit issued? When the project is approved by all plan reviewers, applicable sister
agencies and all fees are paid in full.
4. If my project is denied can I try again? Yes, all denied applicants have the right to adjust and
try again.
5. Can I apply in person? No, all applications must be done online.
6. What other agencies participate? The Department of Energy and The Environment (DOEE),
the District Department of Transportation (DDOT), the District of Columbia Water and Sewer
Authority (DC Water), the District of Columbia Health (DOH), the Office of Planning (OP), the
Historic Preservation Review Board (HPRB), and the Washington Metropolitan Area Transit
Authority (WMATA).
7. How can I determine the disciplines of my project? Each project is unique and have unique
disciplines involved. The best way to ensure you contacted all the required agencies is to
contact DCRA at DCRAacceleratedreview@dc.gov