Program Limitations
●
Failure to resolve construction document comments prior to the Review Session without
notifying management within 5 business days may result in a postponed review session,
based on availability.
●
Failure to comply with the review comments after the second round of reviews will
require management determination of continued participation in Program.
●
Intentional or egregious failures to adhere to DCRA policies and procedures such as;
falsifying applications and changes to the documents without notification will result in
project being removed from the program forfeiting all fees, to date.
●
Program manager is authorized to render a determination for suspension based upon
the applicant’s failure to comply with the Programs adopted policies and procedures.
●
Notices of suspension shall be in accordance with a written letter of determination to
include:
●
o
Reasoning
o
Determined duration of the suspension; 180 days, 1 year or permanent.
o
Right to appeal.
APR services may not be used in conjunction with the standard permitting system. More
specifically, same projects may not be submitted simultaneously in both standard
permit issuance and in the accelerated program.
●
Acceptance and/or continuation into the Program is at the discretion of the APR Program
Manager.
**Note: NOT all applicants will be accepted into the program.