Best practices book - Flipbook - Page 133
BEST PRACTICES | 124
CHECK BOX
BELOW IF
REQUIRED
18.
BEST PRACTICES | 124
2. Prior to occupancy and after sufficient completion for the purposes of pressure difference
testing, flow measurements and detection and control verification.
1. During erection of ductwork and prior to concealment for the purposes of leakage testing
and recording of device location.
Testing Scope (1705.18.1): The test shall be as follows:
REQUIRED SPECIAL INSPECTIONS &TESTING
SPECIAL INSPECTIONS FOR SMOKE CONTROL (1705.18):
PLEASE PROVIDE THE NAME AND PHONE
NUMBER OF THE SPECIAL INSPECTION
AGENCY AND INDIVIDUAL PERFORMING
THIS SPECIAL INSPECTION SERVICE IN THE
SPACE BELOW.