Best practices book - Flipbook - Page 118
BEST PRACTICES | 109
3.
PERIODIC
-
-
X
X
X
X
CONTINUAL
X
X
-
X
X
-
-
-
Referenced Standards*: ACI 318: 26.11.2
12. Inspect formwork for shape, location, and dimensions of the
concrete members being formed.
shores and forms from beams and structural slabs.
Referenced Standards*: ACI 318: 26.8
11. Verify in-situ concrete strength, prior to stressing of
tendons in post-tensioned concrete and prior to the removal of
Referenced Standards*: ACI 318: 26.10
10. Inspect erection of precast concrete members.
Referenced Standards*: ACI 318: 26.10
b. Grouting of bonded prestressing tendons.
Referenced Standards*: ACI 318: 26.5.3-26.5.5
MBC 2015: 1908.9
9. Inspection of prestressed concrete:
a. Application of prestressing forces.
Referenced Standards*: ACI 318: 26.5
MBC 2015: 1908.6, 1908.7, 1908.8
8. Verify maintenance of specified curing temperature and
techniques.
Referenced Standards*: ASTM C172; ASTM C31; ACI 318: 26.4, 26.12
MBC 2015: 1908.10
7. Inspect concrete and shotcrete placement for proper
application techniques.
6. Prior to concrete placement, fabricate specimens for
strength tests, perform slump and air content tests, and determine
the temperature of the concrete.
REQUIRED SPECIAL INSPECTIONS & TESTING
CONCRETE CONSTRUCTION (1705.3, 1901.6 & TABLE 1705.3):
BEST PRACTICES | 109
Referenced Standards*: ACI 318: 26.11.1.2(b)
* Where applicable, see also Section 1705.12, Special Inspections for seismic resistance.
CHECK
BOX
BELOW IF
REQUIRED
(2 of 2)
PLEASE PROVIDE THE NAME AND PHONE NUMBER OF THE
SPECIAL INSPECTION AGENCY AND INDIVIDUAL
PERFORMING THIS SPECIAL INSPECTION SERVICE IN THE
SPACE BELOW.