4.1 PLANNING FOR TEMPORARY WORKS4.1.1The requirement for temporary works arises from the permanent works design andmethod of building that design. The permanent works designer should beresponsible to the principal designer for identifying temporary works.4.1.2Once a coherent construction method has been agreed temporary works should beidentified by those responsible for the pre-construction phase/stages or when scopingthe works as set out in the table below.Stage1. Identify2. PlanWhat’s involved Surveying/scoping Costs Method to be used Equipment needed Time required Populate temporary worksregister Invite sub-contractors totender Appoint TWC & Deputy TWC Handover to Project TWC Nominate sub-contractor Appoint TWS (whererequired) Develop ConstructionPhase Plan from PreConstructionInformation Develop temporaryworks implementationplan Develop temporary worksregister Establish project filesWho can beinvolved DesignatedIndividual Pre-ConstructionManager Pre-ConstructionTWC Contracts Manager Estimator CommercialManager Procurement Project Lead Project TWCVersion 2 © mytemporaryworks 2023 | The control of temporary works – procedural guideDocument Output Constructionphase plan Temporary worksimplementationplan Letters ofappointment Temporary worksregister51
It seems that your browser's pop-up blocker has prevented us from opening a new window/tab. Please click the button below to open the link manually.
I acknowedge that no part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, photocopying or otherwise, without permission in writing from 2B Trained save it may be read and saved by the original recipient, for whose private use it was originally intended.
Unfortunately an error occurred - please try again.
Table of contents
1
3
5
7
9
11
17
21
25
27
28
29
35
37
41
43
49
51
55
57
59
61
62
63
64
65
66
67
69
71
74
75
77
79
80
83
85
87
91
92
93
94
95
98
99
100
103
105
109
113
115
116
117
121
122
125
126
128
129
131
132
133
135
141
143
147
149
150