3.3 ORGANISATION CAPABILITY3.3.8Temporary works procedures should follow an easy-to-follow simple format thatidentifies actions required, who needs to carry out the action and anyoutput/document(s) required. The following table provides an example of actionsrequired to secure temporary works.Stage1. Identify2. Plan3. Design4. Check5. Build(Implement)6. Remove(Implement)Who can be involved inthis stage?What’s involvedSurveying/scopingCostsMethod to be used.Equipment needed.Time required.Populate temporary works register.Invite sub-contractors to tenderAppoint TWC & Deputy TWCHandover to Project TWCAppoint TWS (where required)Develop Construction Phase Planfrom Pre-Construction InformationDevelop temporary worksimplementation plan.Develop temporary works register.Establish project filesNominate designer – could be thesupplier.Prepare and issue design brief.Design outputNominate a design checker basedon design output (Category)Verify design meets requirement ofdesign briefReview RAMS for installationDistribute final design output andchecklists.Inspect materials/equipment ondelivery.Carry out pre-installation briefingwith team.Supervise build and inspect atstages where necessary.Issue permit to use.Inspect during use.Carry out maintenance during useReview RAMS for removalCarry out pre-removal briefing withteam.Issue permit to remove/take out ofuse.Keep records.Issue information useful for healthand safety fileDesignated IndividualPre-Construction ManagerPre-Construction TWCContracts ManagerEstimatorCommercial ManagerProcurementProject LeadProject TWCProject LeadProject TWCLead TWDTWDTWDCPrincipal DesignerProject LeadProject TWCTWSVersion 2 © mytemporaryworks 2023 | The control of temporary works – procedural guide43
It seems that your browser's pop-up blocker has prevented us from opening a new window/tab. Please click the button below to open the link manually.
I acknowedge that no part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, photocopying or otherwise, without permission in writing from 2B Trained save it may be read and saved by the original recipient, for whose private use it was originally intended.
Unfortunately an error occurred - please try again.
Table of contents
1
3
5
7
9
11
17
21
25
27
28
29
35
37
41
43
49
51
55
57
59
61
62
63
64
65
66
67
69
71
74
75
77
79
80
83
85
87
91
92
93
94
95
98
99
100
103
105
109
113
115
116
117
121
122
125
126
128
129
131
132
133
135
141
143
147
149
150