3.2 CONTRACTURAL INTERFACES3.2.7There are many organisational interfaces involving design and construction oftemporary works. The PC’s TWC has overall responsibility to manage all interfaceswhere they exist.3.2.8Certain organisations can be appointed, where deemed competent to co-ordinate theirown temporary works. These are so termed ‘Managing Sub-Contractors’.3.2.9There are many organisational interfaces involving design and construction oftemporary works. The PC’s TWC has overall responsibility to manage all interfaceswhere they exist. However, where there is an interface in design, a Lead TemporaryWorks Designer should be appointed.Version 2 © mytemporaryworks 2023 | The control of temporary works – procedural guide38
It seems that your browser's pop-up blocker has prevented us from opening a new window/tab. Please click the button below to open the link manually.
I acknowedge that no part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, photocopying or otherwise, without permission in writing from 2B Trained save it may be read and saved by the original recipient, for whose private use it was originally intended.
Unfortunately an error occurred - please try again.
Table of contents
1
3
5
7
9
11
17
21
25
27
28
29
35
37
41
43
49
51
55
57
59
61
62
63
64
65
66
67
69
71
74
75
77
79
80
83
85
87
91
92
93
94
95
98
99
100
103
105
109
113
115
116
117
121
122
125
126
128
129
131
132
133
135
141
143
147
149
150