3.2 CONTRACTURAL INTERFACES3.2.5In relation to temporary works the principal contractor has specific responsibilities.Some are shown below.3.2.6There are many combinations of organisations that can be involved in temporary works.Each have different contractual arrangements from project to project but the overarching principle is that the PC’s TWC has overall responsibility on site.figure 1 – typical contractual relationshipsVersion 2 © mytemporaryworks 2023 | The control of temporary works – procedural guide37
It seems that your browser's pop-up blocker has prevented us from opening a new window/tab. Please click the button below to open the link manually.
I acknowedge that no part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, photocopying or otherwise, without permission in writing from 2B Trained save it may be read and saved by the original recipient, for whose private use it was originally intended.
Unfortunately an error occurred - please try again.
Table of contents
1
3
5
7
9
11
17
21
25
27
28
29
35
37
41
43
49
51
55
57
59
61
62
63
64
65
66
67
69
71
74
75
77
79
80
83
85
87
91
92
93
94
95
98
99
100
103
105
109
113
115
116
117
121
122
125
126
128
129
131
132
133
135
141
143
147
149
150