3.1 TEMPORARY WORKS ROLES IN THE CONSTRUCTION TEAM3.1.1The roles and duties of a project’s temporary works team are usually undertakenby competent persons already carrying out other roles as shown in the summary below.3.1.2BS5975 recommends the following appointments should be made to manage the designand implementation of temporary works:3.1.3Applies to all organisationsFocus area – the companyCould be a directorReports to main boardApplies to contractorsFocus area – the projectCould be the project lead/managerReports to DIApplies to contractorsFocus area – the taskCould be works supervisorReports to TWCThe roles and duties of a designated individual are usually undertaken by competentpersons already carrying out other roles as shown in the summary below.Version 2 © mytemporaryworks 2023 | The control of temporary works – procedural guide31
It seems that your browser's pop-up blocker has prevented us from opening a new window/tab. Please click the button below to open the link manually.
I acknowedge that no part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, photocopying or otherwise, without permission in writing from 2B Trained save it may be read and saved by the original recipient, for whose private use it was originally intended.
Unfortunately an error occurred - please try again.
Table of contents
1
3
5
7
9
11
17
21
25
27
28
29
35
37
41
43
49
51
55
57
59
61
63
65
67
68