1.3 CHOICE OF TEMPORARY WORKS1.3.1An ‘Engineered Solution’ can be either a standard solution or a bespoke design.A bespoke design is anything outside of the standard, i.e., non-standard, but does notmean it’s a complex design.1.3.2The ‘Engineered Solution’ or ‘Design’ can also be expressed or ‘categorised’ as:CategoryDescription0Standard Solution1Simple2More Complex/Involved3Complex/InnovativeThese can be described as‘Bespoke’ solutions/designs ornon-standard solutions1.3.3The ‘Category’ can also be expressed as the ‘Design Check Category’ which relatesto the design risk and the independency required for the design check. The higher thenumber, the more independent or higher-level authorisation or scrutiny the check willneed to have.1.3.4The Law and BS5975 define a designer as:Version 2 © mytemporaryworks 2023 | The control of temporary works – procedural guide9
It seems that your browser's pop-up blocker has prevented us from opening a new window/tab. Please click the button below to open the link manually.
I acknowedge that no part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, photocopying or otherwise, without permission in writing from 2B Trained save it may be read and saved by the original recipient, for whose private use it was originally intended.
Unfortunately an error occurred - please try again.
Table of contents
1
3
5
7
9
11
17
21
25
27
28
29
35
37
41
43
49
51
55
57
59
61
63
65
67
68