UL Site Starters Ordering Guide - Flipbook - Page 14
TOTAL SYSTEM SOLUTIONS™
VENT LINE
PIPEWORK
SITE STARTER
DEFENDER SERIES® PRESSURE / VACUUM VENT WITH IN-LINE VAULT
6
2
TEE APPLICATION
A simple tee allows for a quick
change in pipework direction.
3
COMPONENTS
4
8
1
P/V vent
10
Vent cap
11
In-line vault
12
In-line vault faceplate
13
Defender Series® vent stack adapter
14
OPW® vent stack adapter
(not available for purchase)
5
2
9
2
9
9
5
9
10
contingency quantity of 5% additional components to
cover any unforeseen on-site needs.
13
COMPONENTS
14
13
VENT STACK
Description
2" Model
3" Model
001-063-019VE
001-090-19VE
Terminate primary
pipework at the vent stack.
Item
Model
9-12
DPVV
1
Single Wall Vent Pipe
2
Electrofusion Coupler
02-063-L-U
02-90-U
3
Electrofusion Elbow 90°
03-063-EIF-U
03-090-EIF-U
4
Electrofusion Tee
08-063-EIF-U
08-090-EIF-U
Item
9, 13
5
Termination Fitting, NPT, Male
91-063 NPT-U
91-090 NPT-U
6
Termination Fitting, NPT, Female
92-063 NPT-U
92-090 NPT-U
7
Extractor Valve w/o Adaptor - NPT
31040011
(4"x 4"x 2")
31140011
(4"x 4"x 3")
8
Electrofusion Elbow 45°
04-063-EIF-U
04-090-EIF-U
Description
(1) Defender Series® P/V vent with (1) In-line vault and (1) vent cap
END-OF-LINE TANK VENTING
11
Description
UPP® Electrofusion Welder, 110V
UPP® Rotary Scraper (25-110 mm) 1"- 4"
Model
804100901
Description
Defender Series® P/V vent, and Defender Series® 2" vent stack adapter
RETROFIT & REPLACEMENT PARTS
Item
TOOLS REQUIRED
Model
Description
9
804100930
Defender Series® P/V vent
(includes O-rings for both Defender Series® and OPW® vent stack adapters)
10
804023901
Vent cap
12
804110902
Vault faceplate gasket
14
804110901
Maintenance kit includes inlet screen
(includes O-rings for both Defender Series® and OPW® vent stack adapters)
--
804110903
(2) replacement tamper-resistant screws for vault faceplate
UPP® Rotary Scraper (90 mm) 3" (Not shown)
--
804110904
Vault service plug, prevents vapors from escaping during maintenance
SCR.HAR
Handheld Scraper
--
804110905
Vault L-key wrench (T40 tip size)
CLAMP (A)
UPP® Pipe Clamp (45° and 90° angles)
ROTOSCRAPER63MM
RS-90
CLAMP (S)
P.CUT
UPP® Turbo Rotary Scraper (63 mm) 2"
SCR-025-125
CLAMP (A)
CLAMP (S)
UPP® Pipe Clamp (straight)
UPP® Pipe Cutter (50-110 mm) 1"- 4"
ROTOSCRAPER63MM
SCR.HAR
P.CUT
UPP® Electrofusion Welder
EF1-110-A
© 2021 Franklin Fueling Systems. All Rights Reserved.
FFS-0815 12-21
14
IN-LINE TANK VENTING
UPP® 2" AND 3" PRIMARY VENT LINE
SCR-025-125
OPW® RETROFIT
UPGRADE
APPLICATION
END-OF-LINE
APPLICATION
EBW® extractor vent valves are designed
to fit into a 4" tank opening on an
underground storage tank. A 2" or 3"
outlet facilitates connection with the
UPP® threaded termination fitting.
• Always plan for the unexpected. We recommend a
EF1-110-A
9
TANK CONNECTION
7
fittings installed in parallel. This makes installation simple,
consistent, and hassle free.
Model
11
OPW® is a registered trademark of Dover.
• Vent lines are built in sequence with primary pipe and
Item
IN-LINE VENT
STACK APPLICATION
10
9
12
The UPP® pipework system can be used for both 2" and 3" liquid
tight vent lines. UPP® single wall pipework makes the perfect
solution for vent lines with it’s semi-rigid construction and
installation simplicity. Be sure to always consult local regulations.
IMPORTANT NOTES
INSTALLATION OPTIONS
Install in-line at grade with the in-line vault and vent cap or end-of-line with the Defender Series®
vent stack adapter. The P/V vent is also compatible for retrofit onto existing OPW® vent stack
adapters. All installation methods are compatible with manifolded vent lines as well.