➢ Long-Term Cost Savings: While there are upfront costs associated with the
expansion of the road and stormwater, it is an investment in the City’s long-term
financial sustainability. By proactively addressing the need for increased sewer and
water system capacity, the City can avoid more significant and costly repairs and
malfunctions in the future.
➢ Community Well-Being: By providing roads for emergency services and sidewalks
for pedestrians, the project will increase the safety and well-being of our citizens.
The expansion contributes to the overall quality of life for Eustis residents by
providing residents with a project that will promote a high standard of living.
➢ Planning for Future Growth: With the expansion of the Coolidge and 7 Side Streets
Road and Stormwater, the City is promoting development in the Rosenwald Garden
area. By installing roads and stormwater, the City has demonstrated forwardthinking urban planning and infrastructure development.
The expansion of the Coolidge and 7 Side Streets Road and Stormwater represents one
phase of a proactive and forward- looking investment in the City’s infrastructure,
environment, and community well-being. It supports growth, protects the environment,
ensures regulatory compliance, and contributes to the long-term financial stability of the
City. This reflects Eustis’ commitment to responsible urban development and
environmental stewardship.
b. Coolidge Side Streets Sewer & Water Expansion: In FY 2024/25, the City will start the
construction of the Coolidge Side Streets Sewer and Water Expansion project. This
project will be funded by the Utility R&R Fund, the Sewer and Water Impact Fee Funds.
Additionally, staff has applied for FDEP Funding.
The expansion of the sewer and water system will provide utilities for future growth in
the Rosenwald Garden area. The new sewer system will eliminate septic tanks for future
development and allow for septic to sewer projects on existing homes. The water system
will allow for growth and fire flow on in an area that could not support the demand. This
project aligns with the Competent and Effective Government Priority, specifically Goal
#3 Strategic Priority 3 of the City’s Strategic Plan - Develop, adopt, and implement
master plans for the repair, replacement and expansion of public utilities and facilities.
The expansion of the Coolidge Side Streets Sewer and Water Expansion offers several
significant benefits to both the City and its residents. This expansion project is a strategic
investment in the City’s infrastructure and environmental stewardship. Here are some
key advantages:
➢ Increased Sewer and Water System Capacity: The Coolidge Side Streets Sewer and
Water expansion will increase the City’s sewer and water system capacity. This is
crucial for growth in this area. The expansion ensures that the City can handle this
increased demand and support continued growth and development.
➢ Environmental Protection: Sewer systems are vital for safeguarding the environment
and public health. Expanding the sewer system lowers the number of septic tanks
being installed and allows for septic to sewer conversions.
➢ Improved Water Quality: The reduction in septic tank installations will improve water
quality in local rivers, lakes, and groundwater. This benefits not only Eustis residents
but also the broader community by preserving the ecological balance and the
quality of water resources.