MP Sedimentationsbrochure MARTS2021 WEB - Magasin - Side 5
CASE STORIES
Various projects
Marius Pedersen A/S performs various projects.
The water quality involved in the individual case
will determine the specific solution and whether
a sedimentation, oil separation or sand filtration
solution is required.
Construction of multi-storey buildings
Establishing basements in multi-storey
buildings, Marius Pedersen A/S has installed
complete systems consisting of settlement and
sedimentation containers combined with various
filtration systems for cleaning of surface water.
Tunnel construction projects
Handling of contaminated water and sedimentation
in connection with construction of metro stations.
Construction works involve excavation works down
to the level of the metro tracks. As work is performed
below ground water level, water poses a challenge at
the construction site.
Contamination projects
Modular solutions involving the installation of multiple filtration containers to assist in the cleaning of
diesel-contaminated sand.