SERVICES
TYPE
Lighting
Power
Item
Number
Location
Light Fitting
As Required
Double Power Outlet
Two
Communications
None
r
r
Heating
None
r
r
Cooling
None
r
r
Ventilation
Mechanical or Natural
As Required
Water
Hot and Cold Water to
As Required
All Fixtures and Equipment required to
All Taps
be connected to water
All water connections
direct to the Water Main
Waste Water
All waste water
As Required
connections direct
All Fixtures and Equipment required to
be connected to a waste for water
to the Sewer Main or
approved on-site sewage
management system
Floor Waste
Minimum
One
Gas
Security
None
Connect to Building
r
r
As Required
As Required
Security System
Fire
Fire Extinguisher, Fire
Hydrant, Fire Hose Reel,
Sprinklers or similar
PAGE 142
APPENDIX A - COMMUNIT Y CENTRE