23 428196 Camden Public Building Design Manual 1 August 2023 - Flipbook - Page 119
TYPE
Description
Number
NOTE
Any other Fittings
As Required
r
Hand Dryer
One
r
Any other Equipment
As Required
r
As Required
r
Required in Accordance
with AS1428
Equipment
Required in Accordance
with AS1428
Fixed Furniture
Any Fixed Furniture
Required in Accordance
with AS1428
Loose Furniture
Not Included in the
r
Supply by Others
Delivery of the Building
SERVICES
TYPE
Lighting
Item
Number
Location
Light Fitting
As Required
In Ceiling
Power
None
r
r
Communications
None
r
r
Heating
Ducted or Split System
As Required
Cooling
Ducted or Split System
As Required
Natural Ventilation
As Required
Hot and Cold Water to
As Required
All Fixtures and Equipment required to
Ventilation
Water
All Taps
be connected to water
All water connections
direct to the Water Main
Waste Water
All waste water
As Required
All wastewater producing fixtures and
fittings required to be connected.
connections direct
to the Sewer Main or
approved on-site sewage
management system
Floor Waste
Minimum
One
Gas
None
CAMDEN PUBLIC BUILDING DESIGN MANUAL
r
r
PAGE 119