23 428157 Camden Open Space Design Manual 1 August 2023 - Flipbook - Page 43
WARRANTIES HAND OVER
CONSULTATION
DESIGN + DOCUMENTATION
The Contractor
shall warrant the
construction of the
works including
materials and
installation with a
warranty in writing
submitted to the
Contract Administrator
prior to the Date of
Practical Completion.
A meeting is required
to occur on site no
more than 30 calendar
days after the Date of
Practical Completion
and will be held to
explain the operation
of the executed works
to Camden Council
representatives.
Establish and maintain regular consultation points
with Camden Council throughout the design and
documentation period.
Coordinate the necessary consultation points with
the Camden Council prior to the commencement of
the design process.
CONSTRUCTION
Establish and maintain regular consultation points
with Camden Council throughout the construction
period of the process.
The Contractor shall
also obtain and ensure
that the Principal will
have the benefit of all
warranties applicable
to the materials and
installation included
in the construction
works.
CAMDEN OPEN SPACE DESIGN MANUAL
PAGE 43
4