23 428157 Camden Open Space Design Manual 1 August 2023 - Flipbook - Page 42
4.1
Construction Requirements
The following Construction Requirements underpin successful construction in Camden to ensure the
design intent is delivered for the open space project. These principles must be included in the construction
documentation and be a part of the construction delivery for every newly built and updated existing open
space within the Camden LGA.
INSPECTION
POINTS
TRADE
NAMES
Include inspection
points within
documentation for
construction to ensure
that the quality of
workmanship is
checked regularly
by the Contract
Administrator and that
the built works are
suitable for purpose.
No work is to proceed
beyond any inspection
point until the work
is executed to the
satisfaction of the
Contract Administrator.
Where a trade name,
brand or catalogue
number is referred
to in the documents
for construction,
the Contractor may
substitute similar
material or equipment
provided that in the
opinion of the Contract
Administrator the
characteristics of
type, quality, finish,
appearance, method
of construction and
performance are
not less than that
specified, and are
accepted as suitable
by the Contract
Administrator.
It is the Contractors
responsibility to keep a
detailed and organised
photographic record
of pre-existing
conditions, as well
as all completed
structural and services
works, particularly
where the element
will be permanently
concealed.
PAGE 42
Such acceptance shall
not be anticipated
because of a similar
approval having been
given in a previous
contract.
AS
OPERATION &
CONSTRUCTED MAINTENANCE
DRAWINGS
MANUALS
Ensure that
information for the
location of in-ground
services and other
constructed works are
accurately recorded
as construction
progresses.
Require that all as
constructed drawings
are submitted by the
Contractor in hard
copy and digital pdf as
well as dwg formats.
As constructed
drawings are a
condition of Practical
Completion.
Review all of the
information in the as
constructed drawings
and confirm that it
is correct prior to
accepting the as
constructed drawings
are suitable.
Ensure that information
for all of the services
and equipment relating
to the operation and
maintenance of open
space works are collated
in one place. Prepare
a written schedule
for the operation
and maintenance
requirements for all
of the services and
equipment installed in
open space works.
Require that all
Operation and
Maintenance Manuals
are submitted in
hard copy and digital
pdf as well as doc
formats. Operation and
Maintenance Manuals
are a condition of
Practical Completion.
CONSTRUCTION REQUIREMENTS