CENTRED 600mm MINIMUM
(1000mm PREFERRED)
CONCRETE FOOTPATH
WIDTH VARIES (MIN 1200 mm )
PROVIDE BREAK IN KERB TO ALLOW FOR
PASSIVE IRRIGATION. EDGE OF OPENING TO BE
CHAMFERED AT 45° TO TOP OF KERB
300
TURF
HARDWOOD STAKES AS
NOTED AND 50mm HESSIAN
BAND STAPLED TO STAKE
CENTRED
600mm MINIMUM
(1000mm
PREFERRED)
1500mm OR AS SPECIFIED
CONCRETE EDGE AS REQUIRED
CONCRETE EDGE FLUSH WITH GUTTER INVERT
600mm ROOT BARRIER TO EDGE OF TREE PIT
PLANTING HOLE - REFER NOTES
ROAD
GUTTER
KERB
300
TEMPORARY TREE GUARD - REFER NOTES
TURF
8.1
600mm ROOT BARRIER TO BACK
OF KERB/FOOTPATH. INSTALLED
ADJACENT TO THE PATH AS PER
MANUFACTURER'S STANDARD
INDICATIVE LOCATION OF
SHARED SERVICES TRENCH
PLANTING HOLE - REFER NOTES
CONTAINER ROOTBALL
150mm WIDE CONCRETE EDGE TO FINISH FLUSH
WITH TOP OF KERB AND ADJACENT PATH.
TS
75mm DEPTH OF MULCH AS SPECIFIED
TO BASE OF TREE, FINISH JUST
BELOW FOOTPATH & KERB LEVEL
TREE PLANTING IN PARKING BAY WITH PASSIVE IRRIGATION BREAK IN KERB
PLAN - TYPICAL
1:20 @ A1
CULTIVATED SUBGRADE
300mm DEPTH
TS
8.2
TREE PLANTING IN PARKING B
BREAK IN KERB
SECTION -
CENTRED 600mm MINIMUM
(1000mm PREFERRED)
1500mm OR AS SP
CONTAINERISED STREET TREE AS SPECIFIED
HARDWOOD STAKES AS NOTED
AND 50mm HESSIAN BAND
STAPLED TO STAKE
GRADE MULCH SO THAT IT IS KEPT AT LEAST 50mm
CLEAR OF THE STEM COLLAR. INSTALL EXPANDABLE
PLASTIC COLLAR GUARD
FORM SMALL BERMED DISH CLOSE TO THE
EDGE OF POTTED ROOTBALLL TO FACILITATE
ENTABLEMENT WATERING
75mm DEPTH OF MULCH AS SPECIFIED
TO BASE OF TREE, FINISH JUST
BELOW FOOTPATH & KERB LEVEL
PROVIDE BREAK IN KERB TO ALLOW FOR
PASSIVE IRRIGATION. EDGE OF OPENING TO
BE CHAMFERED AT 45° TO TOP OF KERB
CONCRETE EDGE AS REQUIRED
ENSURE POTTED SOIL LEVEL AND STEM COLLAR IS
SET MAX 200mm FROM TOP OF KERB LEVEL
KERB
600mm ROOT BARRIER TO BACK
OF KERB/FOOTPATH. INSTALLED
ADJACENT TO THE PATH AS PER
MANUFACTURER'S STANDARD
INDICATIVE LOCATION OF
SHARED SERVICES TRENCH
PLANTING HOLE - REFER NOTES
ROAD
FILTER MEDIA
TRANSITION LAYER
600mm ROOT BARRIER TO BACK OF
KERB/FOOTPATH. INSTALLED INSTALLED
BELOW THE INVERT OF THE KERB AS
PER MANUFACTURER'S STANDARD
DRAINAGE LAYER
SUBGRADE
INDICATIVE LOCATION OF
STORMWATER SERVICES
100mm DIAMETER SLOTTED PVC PIPE
CONNECTED TO STORMWATER SYSTEM
TS
8.3
TREE PLANTING IN PARKING BAY WITH PASSIVE IRRIGATION BREAK IN KERB _ OPTION
SECTION - TYPICAL
1:20 @ A1
KERB