NOTE:
1. THE DRINKING FOUNTAIN MUST BE LOCATED ADJACENT TO AN ACCESS PATH
2. WHEEL CHAIR ACCESS AREA TO BE KEPT CLEAR SHOWN HATCHED
C/L
500
500
1000
MEET PAT - BUBBLER AND BOTTLE
REFILL STATION
1500
370
50mm DIA. PVC DRAINAGE PIPE TO
CONNECT TO AG LINE IN DRAINAGE PIT
CONCRETE BASE CAST IN SITU,
FINISH TO MATCH ADJACENT PATH
280
800
1080
1450
C/L
75mm COMPACTED ROAD BASE OVER
COMPACTED SUB-GRADE
1300
50mm DIA. PVC DRAINAGE PIPE TO
CONNECT TO AG LINE IN DRAINAGE PIT
BU CAMDEN STANDARD BUBBLER
BU CAMDEN STANDARD BUBBLER
1.1
1.2
PLAN - TYPICAL
1:20 @ A1
SECTION - TYPICAL
1:20
BIKE RACK. REFER SPECIFICATION
2200 MIN. AREA OF HARD WEARING BASE
C/L
C/L
1000
600
SURFACE FINISH AS SPECIFIED
1800 MIN. AREA OF HARD WEARING BASE
450
600
900
REINFORCED CONCRETE FOOTING. REFER
MANUFACTURER SPECIFICATION
450
CORE DRILL AND SET BIKE RAIL MIN 190mm
INTO REINFORCED CONCRETE FOOTING
75mm COMPACTED ROAD BASE OVER
COMPACTED SUB-GRADE
COMPACTED SUBGRADE
HARD WEARING BASE MATERIAL SUCH AS STABILISED DECOMPOSED GRANITE,
BRICK PAVING, CONCRETE OR OTHER AS APPROVED BY CAMDEN COUNIL.
EXISTING SUBGRADE
BR BIKE RACK
1.1
BR
PLAN - TYPICAL
1.2
1:20 @ A1
REVISION DATE
DESCRIPTION
DRAWN
VERIFIED
APPROVED
A
DRAFT FOR REVIEW
NB
TV
XX
27/10/2022
APPROVALS
BIKE RACK - SUB-SURFACE MO
SECTION - TYPICAL
PROJECT
CAMDEN STANDARD DETAILS
TEAM LEADER
RECOMMENDED DATE: 27/10/2022
CAMDEN LGA
SHEET TITLE
FURNITURE - BUBBLER & BIKE RACK