CNC Report 08.26.24 8.5x11 - Flipbook - Page 84
pe-co district..
SITE PLAN
LINDEN AVE
COURTLAND PL
COURTLAND PL
PEABODY AVE
CARR AVE
VINTON AVE
VINTON
HARBERT AVE
HARBERT AVE
COWDEN AVE
COWDEN AVE
0'
Typical building in the corridor design:
AVE
150'
300'
600'
900'
1" = 300'-0"
M
•
•
•
•
84
3-story building with 5,486 sf ground floor retail and 2 levels
six60
0 20of 40
1-bed apartments of 2 people each and 5,300 sf per floor
70% roof coverage as a blue roof for toilet flushing water collection
35% PVT coverage on roof and 35% extensive green roof
62% reduction in EUI for new construction and 53% EUI reduction
for retrofit
archimania
80 100
150
CA R B O N NE U TR A L
CORRDIOR Memphis, TN | 01.22.2024
Transsolar
KlimaEngineering
existing
building
200
250
new construction
RH resource hub