mSP Firm Profile 2024 - Portfolio - Page 44
MEMORIAL HERMANN SUGAR LAND HOSPITAL | Sugar Land, Texas
Strategi
PA
Memorial Hermann Sugar Land Hospital Expansion consisted of a total of 155,000 sq. ft. construction of a five-story
patient bed tower with 30 medical/surgical patient rooms, 16 ICU rooms, 14 IMU rooms, 2 endoscopy and 1 bronchoscopy
rooms and support services including dietary, education, PACU, pharmacy. Level 5 of the tower remains in a shelled
condition. This project also included the construction of a two-story central processing department addition located in
the existing loading dock area. Renovations within the existing hospital included the construction of new surgery locker
rooms, shell space for four future operating rooms and lab reconfigurations.
CONSTRUCTION COST
$53,000,000
BUILDING CONTROLS ENGINEER
TME, Inc.
PROGRAM COST
$78,000,000
STRUCTURAL/CIVIL ENGINEER
Walter P Moore
ARCHITECT
HDR Architects
MEDICAL EQUIPMENT PLANNER
GKL Health Services
MEP ENGINEER
Shah Smith and Associates
CONTRACTOR
DPR Construc琀椀on
CONSTRUCTION DURATION
Project Start - 10/01/2014
Project Finish - 09/02/2016
OWNER
Memorial Hermann
Health System
HEALTHCARE FACILITY
44