FINAL GPSJ Summer edition 2024 ONLINE VERSION.2pdf - Flipbook - Page 40
GPSJ
ROADS & HIGHWAYS
SHIMPAC® - A Marathon AND a Sprint:
The Olympian of Ironwork Seating
& Levelling
As the world watches Olympic athletes push the boundaries of human speed and endurance, the
same principles of elite performance and durability are at the heart of SHIMPAC®’s innovative system
Combining what may appear
to be polar opposites when it
comes to required attributes,
SHIMPAC® excels in both
speed AND durability, making
it the sprint and marathon
champion of the highways
arena.
The Sprinter: Lightning-Fast
Installation
With the Olympics in full swing, the
world is captivated by the speed of
elite sprint athletes. From swimming
40
pool to athletics track, fans
worldwide are excited by speed, all
observing the quest for faster that
event participants are striving for
The SHIMPAC® system can be
installed in just 15 minutes
SHIMPAC® embodies this same
pursuit of speed, revolutionising
ironwork seating and levelling with
its rapid installation and minimal
disruption.
Traditional roadwork methods can
take 6-7 days for mortar to fully set
GOVERNMENT AND PUBLIC SECTOR JOURNAL SUMMER 2024
SHIMPAC® eradicates this wait
time with its innovative design,
which doesn’t rely on mortar
thickness. Our system can be fully
installed in just 10-15 minutes,
allowing more ironwork seating to be
completed within a single day’s road
closure.
No Cure Time
Unlike conventional methods,
SHIMPAC® requires no curing time.
Roads can be reopened within
an hour, significantly reducing the
disruption and inconvenience for
road users who can resume their
journeys with minimal delays.
SHIMPAC® encompasses both
speed and durability
The public’s desire for faster and
faster performances is mirrored
in SHIMPAC®’s commitment to
reducing road closure times and
enhancing efficiency.
Just as sprinters astonish us with
their speed, SHIMPAC® impresses
with its ability to get roads back