Presentation is everything for Anderson Group
Michael Keeley prides himself
on orderliness – and not just in
how he manages his complex and
broad-reaching role as Associate
Production Director of Construction.
Here, he explains why one of the
products he helped introduce to
Anderson sites two years ago is
keeping them neat and tidy – and
safer than ever.
I started working in construction when
I was 17 and a lot has changed in the
last 25 years. Two of the major shifts
have been in the emphasis we now
put on safety and site presentation
– things that, almost three decades
ago, didn’t factor as high on the list
of priorities as simply getting the job
done.
The SiteStak system provides a
solution to the problem of storing and
stacking underground drainage pipes
and 昀椀ttings for quick access. Before we
discovered this product, pipes would
be held in a compound – sometimes
bluejaysolutions.co.uk
bluejaysolutions.co.uk
CASE STUDY
a couple of miles away from the
place where they were needed – or in
smaller piles on site, often making the
area look messy.
SiteStak holds up to 25 lengths in each
secure container, keeping everything
tidy, providing an easier stock control
system, reducing accidents, removing
mess and improving e昀케ciency.
We started working with the product
two years ago after the manufacturer
BlueJay agreed to make some extra
modi昀椀cations to meet our needs.
We asked for the equipment to have
a lockable lid and lockable toolbox
attachment to keep our equipment
and product safe, and to incorporate a
workstation where pipe can be cut and
prepared for installation. This cutting
tool allows us to put a saw into a
groove to meet the pipe and cut exact
lengths – such as the 600mm length
needed for a rocker pipe.