2022 PHILIPPINE RESPONSE - Report - Page 161
PHILIPPINE MEASURES
Immediate Measures
In the letters of MARINA dated 20
January 2022 (Attachment 54 Letter to Protect Marine and
Engine Officers of the Philippines,
Inc. and Attachment 55 - Letter to
Integrated
Maritime
Practical
Assessment Center & Technical
Solutions (IMPACTS)), the ACs were
duly notified of the EC findings and
were
required
to submit
corrections and corrective actions
to rectify the specific findings by 24
January
2022
taking
into
consideration the requirements
under the STCW Circular Nos. 201808 and 2018-09, as amended by the
MARINA Memorandum Circular
No. SC-2020-03. Moreover, the
concerned ACs were required to
submit measures to preclude the
recurrence of the said findings and
to mainstream the said mitigating
measures in its Quality Standard
System (QSS).
●
Protect Marine Deck and Engine
Officers of the Philippines, Inc.
Bullet 9
In response to the letter, PROTECT
submitted its corrective measures
(Attachment
56)
with
documentary evidence showing
the Purchase Order, Sales Invoice,
Delivery
Slip and
Collection
Receipt
of
the
fixed
VHF
(Attachment 56-B) set as well as
the actual photos (Attachment 56C) and video (Attachment 56-D) of
the equipment. The Evaluation and
Inspection Team shall be deployed
to verify compliance of the actual
equipment delivered.
155
Bullet 10
In response to the letter, IMPACTS
submitted its corrective measures
(Attachment
57)
with
documentary evidence showing
the contract with URA 727
Software
Solutions
on
the
fabrication of the Steering Wheel
Console Unit Parts (Steering
system touch panel, Rudder
indicator panel. Engine RPM
panel, Engine Throttle touch
panel, VHF handset mount) which
will be delivered by the end of
March 2022 (Attachment 57-B).
Once the MARINA has been
notified of the physical availability
of the equipment, the Evaluation
and Inspection Team shall be
deployed to verify compliance of
the actual equipment delivered.
KEY AREA 4
1.