1
Why should a competent person inspect temporary works structures
Your
Correct
before issuing a permit to take out of use?
answer answer
A
It gives the company someone to blame if anything goes wrong
B
To ensure a structure has attained adequate strength and stability
prior to removal of the temporary works
C
It is what the client expects to be done
D
It helps keep time to a minimum therefore lowering the costs
2
When can a temporary works supervisor (TWS) issue a permit?
A
If authorised by the Client and the site manager, and if the design
check category is 0 or 1
B
If authorised, competent and the risk classification is low or very low
risk
C
As long as they have experience using the temporary works in
question it will be ok
D
Only if they have used the same temporary works on another site in
the last month
3
To minimise the risk of structures collapsing, what important
Your
Correct
factor should you consider when implementing temporary
answer answer
works structures?
A
The cost of the equipment and how long they will last
B
Checking the experience of the workforce
C
The size of the area you are working in
D
Whether you need to consider a younger workforce
Your
Correct
answer answer