TWSTC Study Pack - Book - Page 90
Chapter 3
Organising temporary works
Complete the following quiz by ticking () your answer below.
Alternatively scan the QR code or click here to complete online.
90
4
If there are multiple contractors on site who should be
Your
Correct
appointed to plan, manage and monitor organisational
answer answer
procedures?
A
Principal Contractor
B
Principal Designer
C
Temporary Works Designer
D
Permanent Works Designer
5
When a Contractors Designated Individual is appointed, who
Your
Correct
should they appoint to implement the temporary works
answer answer
procedures that they have prepared?
A
The TWS
B
The Client
C
Plant operators
D
The TWC
6
How could a DI or TWC ensure individuals are competent with
Your
Correct
temporary works?
answer answer
A
Check they have the correct PPE on day one
B
Ask a previous employer for a reference before they start
C
You shouldn't need to, people shouldn't work on any task if they are
not competent
D
Don't worry as the clients insurance will cover any failures
© 2B Trained Ltd | Temporary Works Training Course l Study Pack l Quiz 3 l Document Version: 4.00