TWSTC Study Pack - Book - Page 24
The design brief
Scenario 2
You are a project manager and the appointed principal contractor temporary works coordinator.
The redundant factory has been demolished and the ground contamination and the Japanese
knotweed have been removed. Drainage works around the boundary of the new 4-storey office
block have recently been completed.
A scaffolding contractor has been appointed and your task, using the site plan below, is to
complete the design brief for a general-purpose access scaffolding to assist building a new 4storey office block.
2
LIST the information the temporary works designer should provide to you and the
considerations and KEY FEATURES the proposed designed solution should include.
These are also expressed as DESIGN CONTROLS or OUTPUTS.
24
© 2B Trained Ltd | Temporary Works Training Course l Study Pack l Exercise 3 l Document Version: 4.00