TWCTC Study Pack - Book - Page 94
Chapter 5
Implementing temporary works
Complete the following quiz by ticking () your answer below.
Alternatively scan the QR code or click here to complete online.
94
4
The TWC should ensure the Inspection Test Plan (ITP) is in
Your
Correct
place and should include hold points. What is a hold point?
answer answer
A
A place to store vehicles, plant and equipment
B
A point at which no further progress is to be made until the necessary
permits or actions have been completed
C
A notice board that shows all safety documents and is visible to the
whole workforce
D
A layby outside the construction site main gate where large vehicles
should wait before being let in
5
Who is responsible for ensuring a Health and Safety file is
Your
Correct
prepared?
answer answer
A
The Principal Designer
B
The Principal Contractor
C
The Client
D
The Temporary Works Coordinator
6
Which of the following would be considered ‘Execution Risks’?
A
Workmanship, Materials, Experience, Use
B
Workmanship, Cost, Experience, Height
C
Working on weekends, Cost, Elevation, Storage
D
Planning, Cost, Experience, Use
Your
Correct
answer answer
© 2B Trained Ltd | Temporary Works Training Course l Study Pack l Quiz 3 l Document Version: 4.00