3
DESCRIBE the purpose of an HSE Approved Code of Practice (commonly referred to as
‘L’ Series or Legal Reference).
Hint:
Tutor Reference:
4
Procedural Guide Paragraph 2.3.1
LO 2.2
In the table below, IDENTIFY who has the responsibility for the following as required by
the Construction (Design and Management) Regulations 2015.
Statement
Client
Principal
Designer
Principal
Contractor
1. Who is responsible for providing preconstruction information?
2. Who is responsible for the construction
phase?
3. Who is responsible for the pre-construction
phase?
4. Who is responsible for preparing the
construction phase plan?
5. Who is responsible for preparing the health
and safety file?
Hint:
Tutor Reference:
52
Procedural Guide Paragraph 2.3.7 and 3.2.1 or HSE L153
CITB 6