Execution risk controls
Acting as either the designated individual, the temporary works coordinator or the temporary
works supervisor, outline the general control measures that should be taken in relation to
the workmanship, materials, experience, and manner of use for the trench lining system/
scaffolding. These are EXECUTION RISKS.
1
IDENTIFY five examples of how workmanship could be controlled.
Top tip: think worst case, i.e., poor workmanship by operatives
Structure type:
IDENTIFY five examples of how materials could be controlled.
2
Top tip: think worst case, i.e., poor quality or unserviceable equipment, materials or
components incorporated into the build.
Structure type: