4.5 THE DESIGN CHECKING PROCESS
4.5.6
For Cat 1, 2 and 3 a design check certificate should be issued once the design checker
is satisfied that the design output is satisfactory to allow the temporary works to be
built.
Figure 1 – example design check certificate
4.5.7
The design checker should not sign the design check certificate until they are satisfied
that the design output meets the requirements of the design brief and/or until such
time as queries have been resolved.