4.4 DESIGN GUIDANCE AND OUTPUT
4.4.5
The following are regulations stating what is required by the temporary works
designer as specified in law, i.e., their statutory duties.
a.
b.
Regulation 9 and 10 of the CDM regulations set out duties placed on
designers. These include the duty to eliminate, reduce or control
foreseeable health and safety risks throught the design process that may
arise during construction work or during maintenance or using a facility or
building once it is built.
Regulation 19 of the CDM regulations places additional duties on temporary
works designers in relation to the ‘general Requirements for All
construction sites’ that relate to arrangements that must be in place in
the construction phase plan.
Version 2 © mytemporaryworks 2023 | The control of temporary works – procedural guide