Procedural Guide - Book - Page 18
1.1 EXAMPLES OF TEMPORARY WORKS
f.
Providing a safe platform for work activity on land or water (e.g. jetty,
scaffolding, edge protection or towers).
g.
Providing measures to control noise, dust, debris, fume, air quality,
groundwater or any site discharges during construction or demolition (e.g.
screens, bunds, de-watering, demolition debris);
Version 2 © mytemporaryworks 2023 | The control of temporary works – procedural guide
5