BS 5975 2019 Extract - Flipbook - Page 87
BS 5975:2019
BRITISH STANDARD
#description 5.1.1.1
#role and responsibilities 5.1.2q), 8.4.1.1-8.4.1.3,
13.3.3, 13.3.4, Table 22
#dismantling 14.3
Temporary works protocol 9.5.1.4-9.5.1.5
#design 13, 19.1.2
#loading (bringing into use) 14.2.1
#organizations involved 5.1.3
#procedures 5.1
#training 5.2
Temporary works co-ordinators (TWCs) 3.51, 11
#amendments to design 13.1.4
#appointment 5.1.1.12, 5.1.1.13, 5.1.2b), 5.1.2k),
9.2.6, 9.3.3, 11.3.1
#authority 9.3.1.2b), 9.3.3.5
#client9s contractors9 5.1.5.3
#implementation plan 14.1.2, 14.1.5
#site team briefing 13.6.3
Temporary works register
#audit 6.2.4
#contents 6.2.3
#preparation 6.2.1-6.2.2
Temporary works supervisors (TWSs) 3.52, 12
#appointment 5.1.2n)-5.1.2o), 9.1.5, 9.3.4,
11.1.3, 11.3.2.9
#issue of permits 12.2.2, 12.3j)-12.3k), 14.1.4 Note,
14.2.1.2, 14.2.2.1
#lines of responsibility 12.1, Figure 2, Figure 3
#role and responsibilities 5.1.1.12 Note,
#issue of permits 11.3.3w)-11.3.3x), 14.2.1.2, 14.2.2.1 5.1.4.4, 12.2-12.3
#principal contractor9s 5.1.1.12, 11.2
#appointment 5.1.2c)-5.1.2e), 9.3.2
#lines of responsibility 11.1.1, 11.2.1.2, 11.3.1.2,
Figure 2, Figure 3
#multiple sites 5.1.4.4
#multiple TWCs 5.1.2h), 9.3.2.5
#other contractors and 11.2.4, Figure 4
#role and responsibilities 5.1.3.1, 5.1.2f)-5.1.2g),
5.1.4.6, 5.1.5.2, 5.1.5.3, 6.1.3.4, 6.2.1, 9.4.3, 11.2.211.2.4, 11.3.2.6 Note
#relationships Figure 4
#role and responsibilities 6.2.2, 9.1.3, 11.3.211.3.3, Table 22
#sub-contractors 5.1.1.13, 5.1.2i), 5.1.5.1, 5.1.5.2
#training 5.1.2m), 9.3.3.2
Temporary works design checkers (TWDCs)
#assessment 9.4.4
#queries raised 13.8
#role and responsibilities 5.1.2r), 8.4.1.18.4.1.2, Table 22
Temporary works designers (TWDs) 8.4
#design brief 13.2.5
#procedures 6.1.1.2
#sub-contractors9 5.1.4.5, 5.1.5.1, Figure 2d)
#training 9.3.4.3
Terrain
#altitude correction factor L.3.2
#category 17.5.1.8, Figure 11
#combined exposure factor 17.5.1.6, Table 16, L.3.8
#displacement height 17.5.1.7, Figure 10
#orography factor L.3.6, L.4.4, Figure L.1
#topography factor 17.5.1.5, Figure 9, L.3.7
Test certificates, raw materials C.4
Testing
#equipment Annex C
#materials and components 16.2.1, 16.9.2, C.3
#safe use of equipment 10.7
#soils 18.3, 18.4
#specification in design 13.5.3
Third parties 3.53
Third party employed contractors 9.6
#procedures 6.1.1.2
Timber 16.4
#beams 16.4.2.11, 19.3.1, Table 11
#commercial grade 16.4.3, Table 14
236#© THE BRITISH STANDARDS INSTITUTION 2019 3 ALL RIGHTS RESERVED