11.2.4
11.2.4.1
11.3
11.3.1
11.3.1.1
11.3.1.2
in the event that any inspections carried out reveal discrepancies between the certified and as
constructed temporary works, prevent loading (or unloading) until the discrepancies have been
rectified to their satisfaction;
ensure a permit to load or proceed (bring into use) is issued after a final check, which is
satisfactory, by either the PC9s TWC, TWC or TWS (see 14.2.1);
s)
ensure that during use of the temporary works all appropriate maintenance is carried out;
t)
ensure a permit to unload or proceed (take out of use) the temporary works is issued, when
it has been confirmed that the permanent structure has attained adequate strength and/or
stability, by either the PC9s TWC, TWC or TWS (see 14.2.2);
u)
ensure that a documented safe system of work is in place and implemented for the dismantling
of any temporary works; and
v)
ensure that any relevant information for the health and safety file is transmitted to the
principal designer.
Duties of the PC9s TWC in relation to other contractors
In relation to other contractors, the PC9s TWC should:
a)
receive the contractor9s DI9s assessment of the capability of the TWS (and TWC where
appointed), including the individual9s acceptance of the role;
b)
ensure that the TWCs and TWSs are operating in accordance with the approved procedures;
c)
provide copies of all information relevant to the contractor9s temporary works design to the
contractor9s TWC;
d)
define the interfaces between the contractor9s works and those of the PC or other contractors to
establish which design briefs should be provided to the PC9s TWC for approval before issue to the
relevant TWD;
e)
receive copies of the relevant design briefs produced by the contractor9s TWC and confirm there
are no adverse effects on any other works (including temporary works) which might be planned;
g)
inspect the contractor9s temporary works, where necessary.
f)
11.2.4.2
BS 5975:2019
for relevant designs, receive copies of the design output, design and design check certificates
prior to implementation of the contractor9s temporary works; and
The PC's TWC should ensure that a contractor9s proposals for temporary works do not adversely
affect/are not adversely affected by other construction works including other temporary works.
The TWC (other than the PC's TWC)
General
Where a client appoints a contractor, or a PC appoints a sub-contractor to manage and possibly also
design the temporary works for which they are contracted, a TWC should be appointed to assist the
PC9s TWC to fulfil their duties (see 11.2.3).
The TWC should be aware that the PC9s DI defines the PC9s TWC9s lines of responsibility in relation
to each contractor9s TWC and/or TWS, which is employed on the site, using Figure 2 and Figure 3 for
guidance (see 5.1).
© THE BRITISH STANDARDS INSTITUTION 2019 3 ALL RIGHTS RESERVED#47